Omaha Technical High School



1923 - 1984

Historical Preservation



Omaha Auditoriums



The Omaha community offers a limited number of auditoriums, from the new convention center to university performing arts centers. The new convention center is geared toward larger groups, with seating available for over 12,000 individuals. The smaller auditoriums hold between 200 and 475 individuals.



While there are options for very large groups, or small groups, the options of auditoriums that hold 1,500 - 2,000 individuals are very limited in the Omaha area. The renovated Tech High Auditorium will accommodate nearly 2,000 individuals and will be available at an affordable rate for use by community, business and non-profit groups, as well as national and international performances and meetings.



The Tech High Auditorium is centrally located near Creighton University and Saint Joseph's Hospital, with easy interstate access. The auditorium has a free, accessible parking lot which is well lit, landscaped and monitored by external security cameras. The auditorium has street access for performers and presenters to bring equipment from the street to the stage. The finished auditorium will offer a beautiful and convenient facility with state-of-the-art acoustics and sound system.



Numerous organizations and businesses have expressed interest in utilizing the renovated facility, due to lack of other viable options for their performing arts and educational needs.



Historical Preservation



Technical High School has a rich history in the Omaha area. It was founded in an era just 56 years after Nebraska was admitted to the Union and the city of Omaha became part of the United States of America.



The auditorium and lobby are the only two remaining parts of the school that still retain the original design of the landmark building. The building's structural integrity and previously restored exterior fabric were pivotal factors leading the Omaha School Board to reinvest in the long-term future of the building. The facility was renovated in 1984 to become the Omaha Public School Teacher and Administrative Center (TAC). Renovation of the 400,000 square-foot building included a new roof, new windows, 200,000 square feet of new space and for new elevators, as well as numerous other improvements.



Later, the main entrance to the auditorium was also completely restored to its original condition. The beautiful, marble lobby has gold-leafed plaster ceiling and bronze chandeliers.



The auditorium interior is a classical design enhanced with intricate detailing. The present seating capacity is for 2,200 persons, with 1,600 seats on the main floor and 600 seats in the balcony. The slope of the auditorium floor provides superior sight lines from all seats. The natural acoustical performance of the auditorium remains exceptional. A complete restoration will bring it back to it's original splendor.



Performing Arts



People that live and work in the Omaha Metropolitan area have a strong interest in performing arts - interest in live theatre, classical music and dance is higher than the national average. A new performing arts facility impact the quality of life in the region by providing more arts education and entertainment oportunities that will add enrichment to the lifestyles of the Omaha community members.



Youth and Education



The renovated facility will aid community development through its educational orientation. The auditorium will be available for use by local elementary, middle and high schools. It will be used for theatre productions, orchestral performaces, graduations and more. In addition to youth, local universities will also use the facility.



Preserving a Legend



The Technical High School Auditorium Restoration Committee seeks funding to renew and revitalize the auditorium back to it's original condition. In addition to making the facility handicap accessible and updating it to meet fire codes, the renovation will also include updates and repairs to electrical wiring, lighting, wood stage, curtains and carpet. The chandeliers, decorative molded plaster and artwork will be carefully cleaned, repaired and, if needed, painted. The stage pit, dressing rooms, green room, restrooms and storage rooms will all be renovated.



Other improvements to further enhance usage, function and flexibility of the auditorium include the purchase and the installation of:


Hydraulic lift for orchestra pit

Computer controlled lighting equipment

Motorized system to lower chandeliers

Additional sound equipment.

This page was last modified on Wednesday, February 15, 2006; at 1:28:04 AM

© Copyright 2005 Omahatechhigh.com. All rights reserved.
Site layout, design, and hosting provided by Ramish Enterprises, Inc.